Construction World April 2016

To provide parking for large numbers of visitors, an underground parking facility, located opposite the Msheireb, Downtown Doha, Qatar, became necessary. The design of the car park offered architects some extra space aboveground to facilitate place making, a collaborative process that shapes the public realm in order to maximise shared value. With this is mind, Dragana Lutic Djokic, landscape architect at Parsons Qatar, contacted Consent LLC (Terraforce Licensees in the UAE) in 2012, requesting an Amphitheatre design. Specifically, the engineers at Parsons were in search of a product that can be used both for retaining and seating purposes. Consent subsequently proposed an arena design with the Terraforce 4x4 Multi Step Block, a light, dry-stack concrete unit, generally used for constructing low terrace walls, stairs and seating arrangements. Aimed at providing efficient and economical steps in conjunction with the original Terraforce retaining blocks, in this case the L16, they have became very popular (in South Africa and abroad) not only for stairway access, but comfortable, practical stair and seating arrangements at leisure amenities and school sports facilities. Initially Djokic specified another precast system for the proposed Amphi- theatre design, but after a presentation by Consent on the Terraforce 4x4 Multi Step Block and L16 retaining block and their colour options, the design was re-rendered with Terraforce blocks. The final design, completed by Fred Laker of Terrasafe, Terraforce’s international retaining wall design service, was approved by Parsons, and in October 2013, Palmera Agriculture Business L.L.C put in the order for the 4x4 Multi Step and L16 blocks. Approximately 5 100 4x4 Multi Step blocks and 4757 L16 blocks were used, and LED lighting installed at intervals for nighttime ambiance. The amphiteater was completed 2014. has been a souq on this site for centuries; the Bedu would bring their sheep, goats and wool here to trade, and the entire market area has been skillfully redeveloped to look like a 19 th -century souq, with mud-rendered shops, exposed timber beams and some beautifully restored original Qatari buildings. > A PLACE TO GATHER Revived in the last decade as the social heart of Doha, Qatar, Souq Waqif, a historic shopping hub, is a must-see highlight of the city. There • Client: Private Engineering Office (PEO) • Project consultant: JAIN Sustainable Engineering Solutions • Design consultant: Parsons, Qatar • Main contractor: UrbaCon trading and contracting • Subcontractor: Palmera Agriculture Business LLC • Wall design: Terrasafe • Block supplier: Consent LLC

be effective while minimising the disturbance of the vegetation. Thanks to the aluminium zinc coating on the TECCO mesh, the mesh blends into the landscape. After vegetation has grown through the mesh, it is barely visible. The vegetation process can also be accelerated with the TECMAT erosion control seed mat. The TECMAT stabilises the topsoil layer and

prevents seeds from washing away. A cost-effective solution

The TECCO and SPIDER systems of Geobrugg, can provide the same level of protection as a conventional protective covering but using only half as many nails. This can significantly reduce the total project costs and the installation time. Studies provide proof of protection and take into account factors such as perforation of the mesh, combined load on the nails and shearing of the mesh on the edge of the spike plate. RUVOLUM software The TECCO system is completed with the RUVOLUM online dimensioning software. RUVOLUM, is a programme that allows designers to assess forces affecting anchor points in relation to geotechnical parameters and verify performance of the system as a whole. RUVOLUM is available to planners free of charge at http://applications.geobrugg.com/appli- cation.htm. Geobrugg Southern Africa offers special user workshops for interested parties to teach the proper use of the system. In these work- shops, planners learn how to use the dimensioning software purpose- fully, efficiently and reliably. During 2014 emergency work had to be done on a section of Fran- schhoek Pass, Western Cape. Slip failures caused traffic disrup- tions and road closures. A combination of TECCO G65/2, TECCO G65/3 and TECCO G65/4 mesh and TECMAT had successfully been installed on the face. The project was designed by SMEC.

45

CONSTRUCTION WORLD APRIL 2016

Made with