Construction World August 2025

˜

 ” ’ ƒ Œ

 „ ‚   † Š ƒ«   “ ‘™ • ›  • š 

    €      ‹³  µ „ € €      „     €  € „ „ ³ ¤ €       €     €€  € €        ƒ  Š ‹       €  €  ƒ‰        „ ƒ  ‰ €‹

Early project works undertaken by Concor include establishing access roads, site offices and an on-site batching plant, in preparation for the large volumes of concrete needed for the turbine foundations.

   – †  ‹ —   ¦ €   € ‹  € „  Š    € †  ƒ‰   „ ª   ‹  € †  †    „ ¦     €  „    € š ‹       ‹      ‹ „      ‹    €  „               ‰    ‹  €    € €     ƒ Ž     ‹      “‰ “ˆ   €    ‹ †     µ   €€  „   €  € ‹³ š  µ¦  ‹    € „  —Š„  „    „  ³ € ‹      Š „    „    € €  €  ‹ „    €  §  „   €€ „   “           ‹ €   €  ƒ‰   €      ‹      €      µ  € „  

 ‡ Ž    €     € †     ƒ‰ Ž    ƒ ƒ      µ      €    „   ˆ  ‹³ €  µ– €     €  ‹   „     „   „ ³     €    „  ‹    € „    €     €       ‹  ‹‰        „        „     €         „   Š       €    „  „   µ   €        ƒ  ‹     ‹³  µ €   €  ‹   ‹          ³ 

A close-up view captures the excavation of a wind turbine base underway at Karreebosch Wind Farm, where Concor is preparing the foundation to exact specifications based on detailed geotechnical investigations.

£

Made with FlippingBook Learn more on our blog