The pour had to be continuous to ensure no cold joints, which meant there was no room for error on this task.
The critical aspect of the project was to avoid disrupting traffic on the N3 as well as over the existing Market Road bridge close to the N3.
AfriSam delivered 1 300 m 3 of concrete in 218 truckloads.
« ° ª « ª ¥ ¨ § « © ª « ¤ ¡ ¢ ª
Due to the dense steel reinforcement, maintaining a concrete slump consistent within the specification was essential.
The new bridge deck spans 103 metres.