Construction World October 2018

PROJECTS & CONTRACTS

S pilling occurs when the dam is at full capacity, and the dam’s spillway – meant to direct excess water downstream during flood periods – comes into operation. This was the first time the dam was subjected to the full range of stresses it was designed for. The dam passed this test with flying colours. Metolong Dam Project Manager, Beyers Havenga, a Technical Executive at GIBB, said that the spilling stage was the last test of the integrity of the dam following the construction phase of the project. “Now we can say that the project was a success. It’s fulfilling its objective, which is to supply water to Maseru and environs for domestic use, as well as for economic development.” The 83 m-high Metolong Dam is situated 30 km east of Maseru. It features a 280 m-long crest, with a 75 m spillway just below it. It is a roller-compacted concrete (RCC) gravity dam, with a total concrete volume of 315 000 m 3 . It is designed to hold a capacity of 63 million m 3 of water. The project was built using an innovative new concrete blend of Ordinary Portland Cement (OPC) and Pulverised Fly Ash (PFA), which improves workability, and reduces the temperature of the mixture when setting and helps to prevent cracking. The Metolong Dam project also comprises an intake tower, outlet works and a raw-water pump station. The Metolong Dam Water Supply Programme forms part of the Lesotho Lowlands Water Project, aimed at improving water supply for domestic water consumption and for local industry, which was hampered by an acute water shortage in the mountain kingdom. According to the World Bank, the new dam supplies water to two- thirds of Lesotho’s two million population,and created employment for 3 000 Basotho during its construction phase. The broader project is also electrifying 75 villages and providing healthcare and HIV/AIDS community support programmes to 15 000 local residents. “Despite only achieving capacity now, the dam has been yielding The new USD100-million Metolong Dam in Lesotho has achieved a significant project success this year, with the dam spilling for the first time since its completion in 2016. MAJOR ENGINEERING MILESTONE IN LESOTHO

water for several years,” said Havenga. “The dam now delivers water to the water treatment works, which supplies Maseru and neighbour- ing towns like Mazenod, Morija, Roma and Teyateyaneng. “Lesotho is urbanising quickly,” said Havenga. “A large proportion of Lesotho citizens now reside in and around Maseru, and this is where most industrial development happens. This puts pressure on infrastructure and other water resources. This project was necessary to support the growth of the country.” The Metolong Dam Water Supply Programme was worth USD450-million and was financed by the World Bank and a consor- tium of funders from the Middle East, Europe and South Africa, with the government of Lesotho. In dam construction, the first time a dam spills is a fascinating, but critical time, explained Havenga. “This is

the first opportunity to see the spillway operating as intended. It is a day for great celebration for us engineers, especially considering how many thousands of people will benefit.” 

Metolong Dam Project Manager Beyers Havenga, a Technical Executive at GIBB.

About GIBB GIBB is one of South Africa’s leading black-owned multi-disciplinary engineering and architecture companies with a solid footprint on the continent. With a legacy that spans over 60 years, the company is a wholly owned South African entity with a 67% black ownership. The company offers design, planning and management services across the entire engineering and architecture spectrum. GIBB is a partner of choice for the private sector, state owned enter- prises and governments who seek knowledgeable talent, with proven experience and the expertise to respond to the numerous infrastructure demands and needs of the continent. GIBB is a Level 2 BBBEE company. The audit was performed by AVS (Acuity Verification Services), a SANAS accredited verification agency.

26

CONSTRUCTION WORLD OCTOBER 2018

Made with FlippingBook Annual report