Consulting Engineers, notes that when dealing with a high profile building like this, there is always the challenge tomeet the required architectural ‘look and feel’ versus the acceptable technical specifications while at the same time factoring in budgetary allow- ances and a shortened programme. “This case was no different,” he says. “An early start on the designs together with continuous design workshops, over the course of the project, ensured that all the results could be met”. He points out the fact that all luminaires used for the building incorporate LED technology, which awarded the project a GreenStar Innovation point. “Our average light power density achieved was 1.08W/m²/100 lux while luminaire switching is done in zones of less than 100 m². Furthermore, all meet- ing rooms and executive offices are controlled with a DALI system that interfaces with the audio visual components of those spaces,” he says.
The contemporary architecture of the build- ing communicates a new vibrancy and economic growth alongside the older residential area of Irene. The architecture also contributes to the precinct’s sense of place and ties into the greater urban plan for Centurion.
PROJECTTEAM Architect: Nsika Architecture & Design Electrical Engineer: Taemane Consulting Engineers Sustainable Building Consultant: Solid Green Consulting Main Contractor: WBHO Project Manager: Abland Landscape Management Company: Insite Landscape Architects
Made with FlippingBook Annual report