Lighting in Design Q4 2021

sized u-channels, allowing easy access to wiring from above the fitting. Below these fittings and mounted onto the mirrored wall are bespoke luminaires with large brass disks complementing the modern industrial aesthetic fusion. General lighting Linear 17 x 8.5, 5 W per metre is used as ambient lighting in the coves and as strip lighting alongside the 28 W bespoke luminaire, adding to the elegance and warmth of the space. Mito 135 14.5Wdownlighters and Raco 68 surface mounted spotlights were also used as general lighting. PROFESSIONALTEAM Developer: City Lodge Hotel Group Architect: LYT Architecture Electrical engineers: Claasen Auret Amandla Engineering Project manager: Metrum Project Managers

Main contractor: Barrow Construction Electrical contractor: MRT Electrical Photography: Courtesy LYT Architecture

Renders of the lighting

10

LiD Q4 - 2021

Made with FlippingBook - professional solution for displaying marketing and sales documents online