Construction World May 2025



     „ „  „           “ « „ „ ‰ ‚ „  ©   „ „        ‚ „  « ‘ “ ƒ ©  Œ         “ ‹  „  „   „       «      © “  ‡ ‹ „ ƒ    „ “        „        Ž ‘   „ “ « ‘  

‘ ‹ „  „  „   ©Š ‹ „   „   ‚      „     „ « ‹  „  ‡         „ ‹ „       ©        „    ‚ „  “   „      « ‘ “   „    „   ‘ ‹  „ „    „      ©   ‹  

The trailer uses to transport structural steel from street level was specifically built for the project.

†

Made with FlippingBook. PDF to flipbook with ease