Construction World May 2025

Left: Lightweight construction methods are being employed with the use of spider cranes and dumpers that are suitable for the project’s weight restrictions. Right: The rehabilitation of the 8 000 m² access ring road is key to the successful functioning of the mall by ensuring access of visitors to the mall.

Concor is providing the steel structure to support the installation of a PV installation that will assist with the mall’s sustainability and energy aspirations.

†•

Made with FlippingBook. PDF to flipbook with ease